
If you buy components for electronic assemblies, the latest ifo survey is a cue to check which parts need a fresh availability check before the next build.
October moved in opposite directions for two groups of German manufacturers. In data-processing equipment and electronic and optical products, 41.5% of firms reported difficulty getting intermediate goods, up from 37.8% in September. Among electrical equipment manufacturers, the share fell from 27.4% to 25.3%.
ifo points to demand linked to AI infrastructure as one possible contributor. It also cites industry reports of growing supply problems for printed circuit boards. Those observations put the survey in context. The figures show how many firms reported a bottleneck across each category, with no breakdown by part number or delivery date.
A practical next step for purchasing teams is to review the few items that could hold up the next build. Check the exact part number, required quantity and need-by date with suppliers, then confirm what your team would need to qualify a second source.
Source: ifo Business Survey, 13 November 2026